  • Central eólica Gastre

    Monday, October 22, 2018

    The project entails the construction of a wind park that will be spread over 45,000ha and comprised of 675 wind turbines. The energy generated will be injected into the national grid (SADI). The co...

  • C1 Santa Luz

    Thursday, November 15, 2018

    The C1 Santa Luz gold project is an open pit operation that will treat ore by flotation and carbon-in-leach processing. Gold deposits and prospects in the project area occur in silicified breccia z...

  • CAB Águas do Agreste

    Wednesday, May 30, 2018

    The new supply system for Arapiraca was inaugurated on August 9, 2014. It was built through a PPP between Companhia de Saneamiento de Alagoas (Casal) and CAB Águas do Agreste. Some 143mn rea...

  • CCC Tuxpan

    Friday, February 15, 2019

    The project entails the construction and operation of a combined cycle power plant, on a 20,26ha area, in the municipality of Tuxpan, Veracruz state, whose energy produced will be integrated into M...

  • CE Santiago Fase II

    Wednesday, February 20, 2019

    The project entails the construction of a wind farm that will have a total of 50 wind turbines. Each wind turbine will be located to maximize electric power production.

    ...

  • Cablebús (Línea 1)

    Friday, March 15, 2019

    The project entails the construction of a safe and efficient transport system with connectivity to subway and bus stations. This first line will be focused on 75% of the limited resources populatio...