Archives

E
  • Eagle Mountain

    Friday, January 18, 2019

    The 5,050ha Eagle Mountain project hosts an indicated resource of 3.92Mt grading 1.49g/t for 188,000oz gold and an inferred resource of 20.6Mt grading 1.19g/t for 729,000oz. The project is ful...

  • Eastern Borosi

    Wednesday, November 7, 2018

    The Eastern Borosi project consists of 176km2 within the Borosi concessions. It hosts gold-silver resources in two deposits and a series of well-defined low sulfidation epithermal gold-silver targe...

  • Eje Canal El Cedro

    Monday, December 31, 2018

    The project calls for transforming avenues into boulevards and complimentary urban renewal works. It is part of a wider plan to carry out 16 works in three different axes in Bogotá. The wo...

  • Eje Córdoba

    Wednesday, December 26, 2018

    The project calls for transforming avenues into boulevards and complimentary urban renewal works. It is part of a wider plan to carry out 16 works in three different axes in Bogotá. The wo...

  • Eje Orbital Sur

    Monday, October 1, 2018

    The project involves the construction of a new express highway that will improve connectivity in southern Santiago. It will offer an alternative to the existing road to Calera de Tango. Vehicles ...

  • Eje Zona Industrial

    Friday, December 21, 2018

    The project calls for road reconstruction and complimentary urban renewal works. It is part of a wider plan to carry out 16  works in three different axes in Bogotá. The works will in...

  • El Alcaraván

    Friday, June 2, 2017

    Being developed by Bioenergy, the biofuel unit of Colombia's state oil firm Ecopetrol, the project aims to produce ethanol from sugarcane grown on a 20,082ha plantation. The plant is designed to pr...

  • El Barqueño

    Monday, February 18, 2019

    The 32,840ha property consists of three blocks of land: the original El Barqueño package (El Barqueño I, II and III), and two adjacent blocks (El Rayo and El Tecolote). The project co...