Parque Eólico Tres Hermanas
The Tres Hermanas project calls for the installation 45 wind turbines of 2MW each.
It is being developed by Parque Eólico Tres Hermanas, a subsidiary of Cobra Peru, which in tu...
The Tres Hermanas project calls for the installation 45 wind turbines of 2MW each.
It is being developed by Parque Eólico Tres Hermanas, a subsidiary of Cobra Peru, which in tu...
The project calls for the construction of a photovoltaic park, spread over 100ha, in the Ascensión municipality, Chihuahua state.
...
The project calls for the construction of a wind farm, on a 825ha property, that will inject the produced power into Chile's northern power grid SING.
Construction will demand a maximum of ...
The project involves the construction and operation of a wind park. The project is part of the larger Tianguá II complex.
...
The project calls for the construction and operation of the 250MW La Caridad I combined cycle plant, which seeks to supply energy at Grupo Mexico's Cananea and Caridad mines in Sonora state and ...
The project aims at moving forward towards achieving power self-sufficiency in the CMPC plant in Puente Alto, so that it may become independant from the central grid and thus reach more afford...
The La Yesca hydroelectric project, part of Santiago river's hydrologic system, will boast an average annual generation of 1,210GWh. Its retaining wall will be the second highest in the world at mo...
...
...
...
...
...
...
...
PN-T-145 is an onshore 2,099.17km2 area in sector SPN-O of the Parnaíba basin. The block is owned by OP Energia Ltda (100%), a subsidiary of Ouro Preto Óleo e Gás. The com...