This information is available only to subscribers.
Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Río Verde multipurpose project

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
Current Stage: Awaiting construction decision
Start: 04/2018
In Construction
Operation
Project Details

Description

The Río Verde multipurpose hydro project calls for the implementation of water supply systems for human consumption in Río Verde and neighboring areas (a population of 35,000), irrigation and drainage capability in productive areas, as well as flood control for the Río Verde canton. It is possible that the project may work on generating hydroelectric energy.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Consulting
Locked content
Controlling
Locked content
Regulator, Financing
Locked content
Regulator
Locked content
Consulting
Locked content
Engineering
Locked content
Financing
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Río Verde multipurpose project
Project Type
Flood control, Irrigation, Potable water system
Development Phase
Awaiting construction decision
Project Status
Active
Project Capacity
 Flood control
7,200  Ha (Hectares)  Irrigation
 Potable water system
Investment
US$ 130mn
Lifespan
50
Location

The Río Verde multipurpose hydro project is planned for the city of Río Verde in Esmeraldas province.

* The map coordinates represent the approximate latitude and longitude, and not the exact location of the project.

 


Locked content
Owner / operator
Locked content
Analyst of Studies and Projects of Irrigation and Drainage
Locked content
Director of Planning
Locked content
Planning, Investment and Monitoring Director
Locked content
Director of Studies and Projects in Construction
Locked content
CEO Assistant
Locked content
CEO
Locked content
Secretary of Water
Dear visitor, this table includes insights that is only available for subscribers