Loading...

We found 22,683 Results
Click & drag to scroll 
  • Cerro Corona Extension

    2/18/19
    The project entails the extension of the Cerro Corona operation through the technological improvement of the mine's tailings dam so that it can store more tailings. This implies the transformation of the open pit into a...

  • Salares Norte

    2/18/19
    The project comprises 900ha of exploitation concessions and is located in the northern part of the Maricunga Belt. Mineralization at the project is contained in a high sulphidation epithermal system with known mineralization to be...

  • El Barqueño

    2/18/19
    The 32,840ha property consists of three blocks of land: the original El Barqueño package (El Barqueño I, II and III), and two adjacent blocks (El Rayo and El Tecolote). The project contains underexplored zones of gold and silver...

  • Chapada expansion

    2/18/19
    It is a gold project that aims to expand the current production capacity and life of Chapada mine thanks to the discovery of additional reserves in the Suruca deposit, located 6 kilometers northeast of Chapada....

  • Peru economic growth accelerates in 2018

    2/15/19
    Peru's economy expanded last year at the fastest rate in five years, as manufacturing, construction, crude oil, electricity, fishing, banking and telecommunications growth offset declines in the mining and natural gas industries. ...

  • Santa Gertrudis

    2/15/19
    Santa Gertrudis property comprises 42,000ha. The property was the site of a historical heap leach operation that produced 565,000oz of gold from 1991 to 1994. As a past producer, substantial surface infrastructure is already in place....

  • Cobre Panamá

    2/15/19
    The Cobre Panamá concession project, consisting of four zones totaling 13,600ha, will produce copper and molybdenum concentrate. Mine workforce levels will vary between about 317 and 563 people during the operating years....

  • Taca Taca

    2/15/19
    Taca Taca, is a copper-gold-molybdenum project, comprising approximately 2,500ha. The project is expected to generate approximately 1,100 full-time jobs. During the initial years of pre-production, including the concentrator...