Loading...

We found 4,565 Results
Click & drag to scroll 
  • Tepetate wind farm

    2/23/18
    The project calls for the construction and operation of a wind farm that will inject the produced power into Mexico's national interconnected SIN power grid. Construction will demand approximately 200 workers while operation...

  • Consorcio Engie Eólica

    2/23/18
    The wind power developer Consorcio Engie Eólica is the Engie energy group subsidiary behind the Tres Mesas 4 project in the Mexican state of Tamaulipas, which will have an installed capacity of 100.8MW and will generate about 362GWh/y....

  • Pier IV S.A. de C.V.

    2/22/18
    Pier IV S.A. de C.V. is a Mexican company aimed at developing the 220.5MW Pier IV wind park, in the State of Puebla, whose operation starts in 2019. The project consists of 80 wind turbines and will operate under a long-term PPA with...