Loading...

We found 1,591 Results
Click & drag to scroll 
  • Estancia solar project

    1/29/18
    The project calls for the construction of a photovoltaic plant, spread over 200ha, that will inject the produced power into Chile's central SIC power grid through the Punta Colorada substation. Construction will demand around ...

  • Total Eren

    1/29/18
    Total Eren, formerly known as Eren Renewable Energy (Eren RE), a subsidiary of French natural resources conglomerate Eren Group, is a srenewable energy producer founded in 2012 and based in Paris. The firm's global portfolio...

  • Alena wind farm

    1/26/18
    The project calls for the construction, installment, and operation of a wind farm, spread over approximately 825ha, that will inject the produced power into Chile's central SIC power grid. Construction will demand a maximum...

  • San Manuel wind farm

    1/26/18
    The project calls for the construction, installment, and operation of a wind farm, spread over approximately 458ha, that will inject the produced power into Chile's central SIC power grid. Construction will demand a maximum...

  • Voltalia S.A.

    1/24/18
    Voltalia S.A. is an integrated renewable energy company founded in 2005 that engages in the development, construction, operation, and maintenance of wind, solar, mini-hydro and biomass power plants of its own or third parties. Wind...

  • PV Coya solar plant

    1/23/18
    The project involves the construction and operation of a photovoltaic farm that will be divided into two sectors: Coya2-A and Coya 678, which will be 8km apart and connected via a 23kV transmission line. Output power will supply Chile&...

  • Hidromaule S.A.

    1/18/18
    Hidromaule S.A. is a Chilean renewable energy generation company that owns and operates three run-of-the-river hydroelectric plants in Maule region (VII) —Lircay (19MW), Mariposas (6MW), and Providencia (14MW), which came...

  • Hydrika Generacion S.A.C.

    1/17/18
    Hydrika Generación SAC is a Peruvian hydroelectric power generation company headquartered in Lima and subsidiary of the IBT Group, which develops the 55.7MW mini-hydro project Hydrika in Peru which consists of five plants in Pampas,...

  • Tablaruca Wind Project

    1/17/18
    The Tablaruca project calls for the construction and operation of a wind project on Chiloé island in the south of the country. Tablaruca will connect the island to the SIC central grid on the mainland through a 25km 110kV transmission ...