  • Serra do Mel I wind farm

    9/27/18
    Serra do Mel I, part of the Serra do Mel wind complex, is a wind power project that consists of 14 generating units. The project includes associated infrastructure such as a 34.5/230kV step-up substation and a 30km, 230kV power line...

  • Catanduba I wind plant

    2/13/18
    Catanduba I is a wind power project that consists of 10 generating units each providing 3MW. The project includes associated infrastructure such as a 12/138kV step-up substation and a 138kV transmission line which will link the site...

  • Famosa I wind farm

    2/5/18
    Famosa I is a wind farm project that consists of nine generating units. The project includes associated infrastructure such as a step-up substation and a 69kV power line which will link the site to the Mossoró IV substation....

  • São Caetano I wind farm

    2/2/18
    São Caetano I, part of the Baleia wind complex, is a wind power project that consists of 10 generating units, each providing 1.8MW of capacity. The project includes associated infrastructure such as a 34.5/230kV step-up substation and ...

  • Carnaúba II wind farm

    2/2/18
    Carnaúba II is a wind power project that consists of nine generating units, each providing 2MW of capacity. The project includes associated infrastructure such as a 34.5/230kV step-up substation and a 35km, 230kV transmission line...

  • São Caetano wind farm

    2/2/18
    São Caetano, part of the Baleia wind complex, is a wind power project that consists of 14 generating units. The project includes associated infrastructure such as a 34.5/230kV step-up substation and a 185km power line which will link...

  • São Galvão wind farm

    2/16/18
    São Galvão, part of the Baleia wind complex, is a wind power project that consists of eleven generating units. The project includes associated infrastructure such as a step-up substation and a 185km power line which will link the site ...

  • Cervantes II wind farm

    2/2/18
    Cervantes II, part of the Parque Cervantes wind complex, is a wind power project that consists of six generating units, each providing 2MW of capacity. The project includes associated infrastructure such as a 34,5/230kV step-up...

  • Punaú I wind farm

    2/2/18
    Punaú I, part of the Punaú wind complex, is a wind power project that consists of twelve generating units. The project includes associated infrastructure such as a 34.5/230kV step-up substation and a 35km, 230kV power line which will...

  • Umburanas 14 wind farm

    11/12/18
    Umburanas 14, part of the Umburanas wind complex, is a wind power project that consists of nine generating units. It includes associated infrastructure such as a 34.5/230kV step-up substation and a 230kV power line which will link the ...

  • Styrenics plant in Camaçari

    11/3/17
    The styrene plant will be located in the petrochemical complex at Camaçari. The proposed plant would have annual styrenics capacity of 100,000t and it would supply specialty styrenics, acrylonitrile butadiene styrene (ABS) and styrene ...