RELATED ARTICLES

We found 10 results for Advanced design and engineering in Colombiabrowse through our full index

  • Porvenir II hydro plant

    10/11/18
    The Porvenir II project calls for the construction and operation of a 352MW hydro plant on the the Samaná Norte river. It will boast two, 176MW Francis turbines. Other works include the construction of a substation which will link the ...

  • Pisisí port

    12/21/18
    The project entails the construction of a multi-purpose and automated port in Turbo de la vereda de Casanova bay. The project is expected to generate 500 direct jobs and 1,500 indirect jobs....