RELATED ARTICLES

We found 17 results for Cancelled in Colombia, you might also be interested in: Suspended in Colombia, Active in Colombia, or browse through our full index

  • Block SN 10

    11/9/18
    The SN 10 block covers 31,120ha. The contract comprises a first stage which includes the acquisition of 200km of 2D seismic data and the drilling of an exploration well. The second stage includes the acquisition of 100km2 of 3D...

  • Block SN 16

    11/9/18
    The SN 16 block covers 58,752ha. The contract comprises a first stage which includes the acquisition of 200km of 2D seismic data and the drilling of an exploration well. The second stage includes the acquisition of 100km2 of 3D...

  • San Antonio

    11/7/18
    San Antonio hosts a porphyry type, multiphase sheeted and stockwork quartz vein system. The scale of the target appears to be some 1,000m by 800m in size. The area covers 1,664ha and seems to have a good infrastructure, security and...

  • Río Córdoba coal port

    11/12/18
    The project entails the construction of a 1.5km encapsulated conveyor belt reaching out to a new 300m dock in order to increase the loading capacity to between 6,000t-8,000t/h from the current 3,000t/h. It also includes the dredging...

  • Santa Elena

    5/11/16
    The project covers an area of 1,287ha and hosts copper and gold mineralization. The project has on site infrastructure, which includes (asphalted) ready access to the property, two hydroelectric plants, and an abundant supply of water....

  • Block SN 17

    11/9/18
    The SN 17 block covers 127,221ha. The contract comprises a first stage which includes the acquisition of 200km of 2D seismic data and the drilling of two exploration or stratigraphic wells. The second and third stages require four...

  • Riohacha Field

    2/5/16
    The Riohacha field began gas production in 1978 and produced oil between 1997 and 1999. The field was subsequently reactivated in 2012. Chevron, in partnership with Colombia's national oil company Ecopetrol, currently...

  • Pavo Real

    10/31/18
    The project covers an area of about 15 x 20 kms, which is host to numerous porphyry and epithermal gold deposits. Gold mineralization is formed by various bodies of diorite, granite and rhyodacite porphyry, and cut by hydrothermal...