We found 19 results for Awaiting construction decision in Bolivia, you might also be interested in: Insurance in Bolivia, or browse through our full index

  • Sauce Mayu area

    9/4/18
    The Sauce Mayu area covers 45,750ha and corresponds to a conventional reservoir located in the Carboniferous and Devonian formations. The area has 302km of 2D seismic and 223km2 of 3D seismic....

  • El Sillar highway

    8/14/18
    The project calls for the design and construction of the middle section of the road ¿ El Sillar¿, a freeway between Cochabamba and Santa Cruz. The contract relates to the widening and upgrading of the existing road NR 4 to a two-ways...

  • Rositas hydro plant

    4/4/18
    The Rositas hydro project calls for the construction and operation of a hydroelectric power plant in eastern Bolivia's Santa Cruz department. The 156m dam is planned for the Amazonian rivers Grande and Rositas and will...

  • Oruro solar park

    6/6/18
    The project calls for the turnkey contract of detailed engineering, supply, civil works, installation and startup of a solar photovoltaic park in Oruro, whose production aims to cover more than 50% of the electric power demand in...