RELATED ARTICLES

We found 193 results for Bus rapid transit (BRT) system in Infrastructure, you might also be interested in: Metro in Infrastructure, or browse through our full index

  • Alto Tiete BRT system

    8/24/18
    The project to build the bus rapid transit (BRT) system will be divided into three stretches. The system will have a fleet of 67 vehicles – 55 articulating and 12 conventional buses – operating at an average speed...

  • Eight bid for Honduras BRT works

    5/3/18
    The municipal government of Honduras' central district, home to capital Tegucigalpa, has received eight bids for a contract to carry out complementary works on a BRT system currently under construction. Local firm Constructora...