We found 70 results for Awaiting construction decision in Mining & Metalsbrowse through our full index

  • El Espino

    1/9/19
    The project consists of the production of copper concentrate with gold content and copper cathodes of high purity, as a result of the open-pit exploitation of the El Espino deposit. The project includes the development of three main...

  • Almas

    1/9/19
    The Almas project consists of three separate areas. The project's three main gold deposits, Paiol, Cata Funda and Vira Saia, are along a 15km long corridor of the Almas Greenstone belt, a Paleoproterozoic volcano-sedimentary...

  • Mina Carola expansion

    1/7/19
    The expansion project will increase mineral extraction rates from 150,000t to 240,000t per month and involves a general optimization of the existing operating facilities and the expansion of the Cobriza and Meléndez tailings deposit....

  • Tía María

    12/12/18
    The Tía María project involves mining and processing copper oxide and sulfide ores, as well as conglomerate material and low-grade oxide ores. The project will be divided in two phases. During the first phase La Tapada will be mined...

  • Romeral V

    11/5/18
    The Romeral phase V project calls to expand the El Romeral iron ore mine. The project, which involves the expansion of the main pit and the north and south dumps, will extend the life of the operation by 13 years. The plan is to...

  • Corani

    10/10/18
    The Corani silver-lead-zinc project consists of three adjacent open pit deposits: Main Corani, Minas Corani, and Corani Este. The project area is underlain by Tertiary volcanic rocks of the Quenemari formation, specifically a thick...

  • Saramacca

    1/21/19
    The Saramacca project will be a satellite mine to the Rosebel gold mine, given its strategic location, approximately 25km southwest of the latter's milling facility. Mineralization is hosted in the Paramaka Formation within...

  • Oso Negro

    1/16/19
    Oso Negro covers an area of 136ha. The project is located on the Bandurrias iron ore deposit, which approximate thickness is 25m to 30m. The objective is the extraction of iron ore to obtain dry iron concentrate from a vein located in ...

  • Recursos Norte

    8/23/18
    The Recursos Norte project is aimed to maintain the production rates at the Sewell and Colon plants, allowing a continuous and stable processing rate for the El Teniente division. The project will require a workforce of 1,100 people...

  • Ollachea

    10/24/18
    The Ollachea gold underground mine project is expected to recover 91% of gold. An underground mining method described as "sub level stoping with fill" is considered applicable for the efficient mining of the mineralization and...

  • El Toro

    12/19/18
    The El Toro project is comprised of nine mining titles totaling 4,569ha, it's at 3,200 to 3,600 meters above sea level, and located at the Rosa Amparo A.C.6 concession. It will operate as an open pit mine....

  • Potrerillo

    6/11/18
    The Mina de Caliza Potrerillo project involves extracting and processing of limestone from Monte Verde, in northern Chile's Region III. The goal of this project is the production of limestone and lime to supply the operations ...