We found 60 results for Awaiting construction decision in Mining & Metalsbrowse through our full index

  • Recursos Norte

    8/23/18
    The Recursos Norte project is aimed to maintain the production rates at the Sewell and Colon plants, allowing a continuous and stable processing rate for the El Teniente division. The project will require a workforce of 1,100 people...

  • Pilares mine

    7/25/18
    The project consists of an open-pit mine operation that will produce copper in concentrates. The ore will be transported from the pit to the primary crushers of the La Caridad copper concentrator by truck....

  • Tía María

    7/25/18
    The Tía María project involves mining and processing copper oxide and sulfide ores, as well as conglomerate material and low-grade oxide ores. The project will be divided in two phases. During the first phase La Tapada will be mined...

  • Corani

    6/27/18
    The Corani silver-lead-zinc project consists of three adjacent open pit deposits: Main Corani, Minas Corani, and Corani Este. The project area is underlain by Tertiary volcanic rocks of the Quenemari formation, specifically a thick...

  • El Espino

    8/8/18
    The project contemplates an open pit mine. The project has an estimated workforce of 2,700 workers during the construction phase and 600 during the operating phase. The project includes the development of three main sectors in an area ...

  • Potrerillo

    6/11/18
    The Mina de Caliza Potrerillo project involves extracting and processing of limestone from Monte Verde, in northern Chile's Region III. The goal of this project is the production of limestone and lime to supply the operations ...

  • Ollachea

    4/3/18
    The Ollachea gold underground mine project is expected to recover 91% of gold. An underground mining method described as "sub level stoping with fill" is considered applicable for the efficient mining of the mineralization and...

  • Almas

    5/10/18
    The Almas project consists of three separate areas. The project's three main gold deposits, Paiol, Cata Funda and Vira Saia, are along a 15km long corridor of the Almas Greenstone belt, a Paleoproterozoic volcano-sedimentary...

  • Coringa

    3/26/18
    The Coringa project is a shear-vein system located in the Tapajos gold province, in Brazil. Coringa is located at the center of eight contiguous exploration permits, totaling 23,754ha....

  • Jambreiro

    4/11/18
    The Jambreiro iron ore project consists of three mining leases covering 32.7km2. The project is located close to existing infrastructure including sealed roads, a sealed airstrip, industrial water supply and high voltage power....

  • Bonasika

    1/23/18
    The Bonasika bauxite project comprises five blocks; Bonasika 1, 2, 5, 6 and 7, totalling an area of approximately 43km2. The Bonasika bauxite deposits are located in the Coastal Plains region....

  • La Preciosa

    10/26/17
    The La Preciosa silver-gold project would be the world's sixth biggest primary silver mine with annual production of more than 10Moz. The project has initial proven and probable mineral reserves of 126Moz silver and 209,000oz ...

  • Romeral V

    10/5/17
    The Romeral phase V project calls to expand the El Romeral iron ore mine. The project, which involves the expansion of the main pit and the north and south dumps, will extend the life of the operation by 13 years. The plan is to...

  • Los Bronces Phase 7

    8/29/18
    The phase 7 project involves copper extraction from a contiguous area next to the Los Bronces open pit in order to maintain production levels of 160,000t/d up to a maximum capacity of 180,000t/d. The project will have an overall...