This information is available only to subscribers.
Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Cucuana Hydro Plant

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Completion: 11/2015
Project Details

Description

The Cucuana project aims for the need to adjust the colombian production of electricity to the increasing industrial and domestic demand of the country. For this reason, the hydro potential of Tolima department will be used to produce energy, in particular using the waters from the Cucuana and San Marcos rivers.

The initiative consists in the installation and operation of a a run-of-river hydroelectric power plant (without reservoir), with a total installed capacity of 55MW. During the construction phase 865 temporary construction jobs will need to be filled. It is considered that half of them will be covered by people of the region. At the same time, another 300 indirect jobs will be created.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Construction
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Cucuana Hydro Plant
Project Type
Hydro
Development Phase
In operation
Project Status
Active
Project Capacity
55  MW (megawatt)  Hydro
Investment
US$ 118mn
Completion Date
2015
Location

The project will be built in Roncesvalles, Tolima department, Colombia.

* The map coordinates provided represent the approximate latitude and longitude, and not the exact location of the project.


Locked content
Owner / operator
Locked content
Investor Contact
Locked content
Manager of Financial Planning, Treasury and Investor Relation
Dear visitor, this table includes insights that is only available for subscribers