Las Tres Vírgenes Geothermal Field

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Project Details

Description

The Las Tres Vírgenes geothermal field has an installed generation capacity of 10MW via two units of the same size. Mexican state power firm CFE carried out stratigraphic and geological studies to characterize the groundwater sources and the water produced by the wells. Studies showed the operation has a 25-year lifespan with an option to expand into the southern part of the Cerro Blanco geological structure, in order to add an extra 20MW of capacity. The field is related to a quaternary volcanic complex, formed by three volcanoes aligned north-south, with a deposit dominated by liquid. The studies were conducted across a 24km2 area, including the zone of volcanoes La Virgen, El Azufre, El Viejo, El Partido and their peripheries. Drilling of the first exploratory well, LV-2, started in October, 1986, while the commercial exploitation of the resource began in May, 2001. To date, 11 wells have been drilled in the field: four productive wells, four exploratory wells and three injector wells.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Las Tres Vírgenes Geothermal Field
Project Type
Geothermal
Development Phase
In operation
Project Status
Active
Project Capacity
20  MW (megawatt)  Geothermal
Investment
US$ 60mn
Completion Date
2001
Lifespan
25
Location

The project is located on Mexico’s Baja California Sur peninsula, 32km northwest of Santa Rosalía city.

* The map coordinates provided represent the approximate latitude and longitude, and not the exact location, of the project in question.

 


Locked content
Owner / operator
Locked content
Geothermal Sector Manager
Dear visitor, this table includes insights that is only available for subscribers