El Morro desalinization plant Cancelled

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
Current Stage: Feasibility
Start: 11/2012
In Construction
Operation
Project Details

Description

The project involves the construction of a desalination plant as part of the El Morro copper-gold project, a 70:30 JV between Canadian miners Goldcorp and New Gold. The plant is to be located in the coastal area known as Totoral, located in Chile's Atacama region (III). The plant will employ a reverse osmosis process, with a production capacity of 740l/s of desalinated water, and nominal production of 640l/s. The plant will capture a maximum of 2,028l/s, and waste from the process will be discharged back into the sea at a rate of around 1,389l/s. The intake pipeline will be 435m long, 1,200mm in diameter and submerged at a depth of 30m. The discharge pipeline will be 340m long, 900mm in diameter and submerged at a depth of 20m. The plant will require power supply of 13MW which will be obtained through connection with a substation while further project elements include 198km of water transfer pipeline, five pumping stations and two 49,000m3 storage reservoirs, among other interconnected works.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Principal Works

Locked content
Dear visitor, this table includes insights that is only available for subscribers

Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Consulting
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
El Morro desalinization plant
Project Type
Desalination plant
Development Phase
Feasibility
Project Status
Cancelled
Project Capacity
740  l/s (Liters per Second)  Desalination plant
Lifespan
14
Location

The plant will be located in the coastal area of Totoral, south of Caleta Totoral Bajo, northern Chile.

* The map coordinates represent the approximate latitude and longitude, and not the exact location of the project.


Locked content
Owner / operator
Locked content
Country Manager
Dear visitor, this table includes insights that is only available for subscribers