Jaguar Energy Thermo Plant

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Completion: 06/2015
Project Details

Description

The Jaguar Energy thermoelectric project developed by Jaguar Energy Guatemala will produce 300MW, generating 2,100GV/h per year. The plant will generate electric power based on a circulating fluidized bed (CFB) technology, which allows for fuel flexibility and efficiency. The power plant consists of two generators with a nominal capacity of 150MW each, a substation called S/E Jaguar containing two transformers, a double-circuit connecting line and two fields to connect the Jaguar-Aguacapa transmission line to the substation. In February 2014, Jaguar Energy Guatemala hired Ecuador's Santos CMI for the completion of electromechanical and instrumentation works for the entire plant, including the power block; boilers and substation; pre-commissioning and assistance for startup of a coal-fired thermoelectric power plant using two CFB boilers, two 150MW Harbin steam turbines, a fuel handling system and BOP. Jaguar Energy Guatemala is owned by international firm AEI, which in turn owns Puerto Quetzal.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Construction
Locked content
Controlling
Locked content
Consulting
Locked content
Financial adviser, Financial adviser
Locked content
Minor building Works
Locked content
Construction
Locked content
Consulting
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Jaguar Energy Thermo Plant
Project Type
Coal, Combined cycle
Development Phase
In operation
Project Status
Active
Project Capacity
 Coal
300  MW (megawatt)  Combined cycle
Investment
US$ 900mn
Completion Date
2015
Lifespan
15
Location

The project is located in the department of Escuintla, 80km south of Guatemala City and 24km from Puerto Quetzal.

* The map coordinates represent the approximate latitude and longitude, and not the exact location of the project.


Locked content
Owner / operator
Locked content
Executive President
Locked content
Commercial Coordinator
Locked content
CEO
Locked content
Construction Manager
Locked content
Corporate spokesperson
Locked content
Comunications coordinator
Dear visitor, this table includes insights that is only available for subscribers