This information is available only to subscribers.
Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Turístico del Atlántico - Boulevard (In Operation)

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Project Details

Description

The project entailed building a new 24km stretch to connect Las Terrenas and Majagual on the Samana peninsula, and rehabilitating the remaining 99km of highway linking Nagua, Sánchez, Samaná, El Limón and Las Terrenas. It aimed to build a roadway in excellent conditions, including surveillance and value added services facilitating the transport of goods and services. The highway stretch, whose construction began in 2009, opened in October 2011. A consortium made up of two Colombian groups (Grupo Odinsa and Grodco) and a Dominican construction company (Consorcio Remix) was awarded a 30-year concession to operate the stretch.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Principal Works

Locked content
Dear visitor, this table includes insights that is only available for subscribers

Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Concessionaire/operator, Construction
Locked content
Financing
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Turístico del Atlántico - Boulevard (In Operation)
Project Type
Highway
Development Phase
In operation
Project Status
Active
Project Capacity
 Highway
Investment
US$ 178mn
Completion Date
2011
Location

The project's area of influence covers tourist areas between Santo Domingo and Samaná, such as Nagua, Las Terrenas, Samaná, Cabrera and Río San Juan along the northeast coast.

* The map coordinates provided above represent the approximate latitude and longitude, and not the exact location, of the project in question.


Locked content
Owner / operator
Locked content
Operations Manage
Dear visitor, this table includes insights that is only available for subscribers