Loading...

We found 5,413 Results
Click & drag to scroll 
  • Block Río Salado

    10/16/18
    The Río Salado block covers 500km2 and sits within the prolific Tarija basin, lying to the east of the Andes within the sub-Andean foothills. These narrow, north-south trending structures form the basis for the traps in which the...

  • Block Fracción C

    10/16/18
    The Fracción C block covers 5,288km2 and includes three existing production facilities and a gas export pipeline connecting directly to the main Buenos Aires evacuation pipeline. It registers 1,192km of 3D seismic data in addition to...

  • Chimoré area

    10/12/18
    The project at the Chimoré area began in January 2012, covered 388km2 and included 10,100, nine-meter wells packed with 4kg of seismic explosive each. The estimated potential ranges 0.2TT-1Tf3 (5.66B-28.3Bm3) subject to data...

  • Block Cerro Arena

    10/11/18
    The Cerro Arena block covers an area of 860km2 and targets the Vaca Muerta shale formation, in the Neuquén basin, Argentina. It has a moderate exploratory potential for conventional reservoir and a high exploratory potential for non-co...