Loading...

We found 1,062 Results
Click & drag to scroll 
  • Bahía port

    11/16/18
    The port consists of two terminals: a hydrocarbons terminal and a dry cargo terminal. The hydrocarbon terminal has an initial storage capacity of 2.4Mb via eight storage tanks and the capacity to load Suezmax tankers with 1Mb capacity....

  • Río Córdoba coal port

    11/12/18
    The project entails the construction of a 1.5km encapsulated conveyor belt reaching out to a new 300m dock in order to increase the loading capacity to between 6,000t-8,000t/h from the current 3,000t/h. It also includes the dredging...