Loading...

We found 1,078 Results
Click & drag to scroll 
  • Río Córdoba coal port

    11/12/18
    The project entails the construction of a 1.5km encapsulated conveyor belt reaching out to a new 300m dock in order to increase the loading capacity to between 6,000t-8,000t/h from the current 3,000t/h. It also includes the dredging...