Hydraulic Fracture and Construction of Flow Line Well Kiuaku 2
Get all the information on the Hydraulic Fracture and Construction of Flow Line Well Kiuaku 2, a Oil & Gas project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Onshore. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.Description: HYDRAULIC FRACTURE AND CONSTRUCTION OF FLOW LINE WELL KIUAKU 2 Oil and gas mining development projects Since 2006, GeoPark has been developing exploration and exploitation activities in the Fell Block, time that has allowed the company to drill different wells and project the drilling of new wells in the sector. It is worth mentioning that with the definition and design of the specific programs for each one of the wells, the exploitation activities begin. The foregoing allows data and relevant information to be obtained from the reservoir to be drilled, as well as its potential, in order to preliminarily estimate whether its development will be technically and economically viable. Subsequently, within the drilling stage, there are the completion activities, where the reservoir communicates with the surface, at which time GeoPark's technical professionals will be able to verify whether or not the hydrocarbon flow is as expected, all of which will condition the productivity of the wells in case of being low or very low. Sometimes, the drop in flows is related to the blockage of small conduits through which the hydrocarbon would travel from the reservoir to the well, when this situation occurs, the production of the well becomes technically and economically unfeasible. Therefore, the industry usually resorts to the use of methodologies, such as the stimulation of wells, which allow to increase the conductivity in the zone of interest through an increase in the permeability of the rock, improving the flow conditions of the fluids contained in reservoir rock into the well. This project will culminate the drilling activities of the Kiuaku 2 well, which has not started drilling. However, if during the development of this, it is found that the hydrocarbon flow is not as expected and that the well has the necessary characteristics, stimulation will be carried out. The stimulation consists of 3 phases, the first corresponds to the design and assembly phase, in which the wells are defined and subsequently the necessary equipment is assembled in their locations, to move on to the second phase, which corresponds to the operation, where the wells are stimulated and finally, the third, which corresponds to dismantling. Subsequently, if the intervention is positive, the well will be produced, for which this project also considers the surface facilities necessary to achieve this end. Surface installations will vary, depending on the testing stage of the well, the temperature and pressure at which it flows, and the composition of the fluid itself. The equipment to be interconnected on the surface will always be restricted to the area of operation of the well, also called location, as well as the equipment necessary for hydraulic fracturing, if necessary. The laying of the pipeline and hydraulic stimulation will be carried out within a private property, where there are no legal guardianship roads. Through special operating contracts (CEOPs), GeoPark is exploiting the so-called Fell Block located in the commune of San Gregorio in the Region of Magallanes and Chilean Antarctica. To this end, GeoPark is currently, on the one hand, analyzing the information of the existing wells in the Fell Block, to define where there is a reasonable expectation that there will be an increase in production if the connection of the reservoir is improved and, on the other hand, considering the possibility of stimulating the new wells to be drilled. In particular, there is an exploration prospect called Kiuaku 2, for which one of the objectives of this project is to stimulate it (if necessary), and given that this well could be a producer, it is also planned to install the necessary surface equipment to transport its hydrocarbons, for which a 39.09 meter flow line will be built.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Hydraulic Fracture and Construction of Flow Line Well Kiuaku 2.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Hydraulic Fracture and Construction of Flow Line Well Kiuaku 2.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: Sales Manager
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Oil & Gas
Get critical information about thousands of Oil & Gas projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Block FZA-M-332
- Current stage:
- Updated:
3 days ago
- Project: Block FZA-M-330
- Current stage:
- Updated:
2 days ago
- Project: Block FZA-M-328
- Current stage:
- Updated:
3 days ago
- Project: Block FZA-M-326
- Current stage:
- Updated:
3 days ago
- Project: Block FZA-M-267
- Current stage:
- Updated:
2 days ago
- Project: Olmeca Refinery (ex Dos Bocas)
- Current stage:
- Updated:
4 days ago
- Project: Block ES-T-106
- Current stage:
- Updated:
2 days ago
- Project: Block ES-T-87
- Current stage:
- Updated:
2 days ago
- Project: Block ES-T-201
- Current stage:
- Updated:
2 days ago
- Project: Block PN-T-46
- Current stage:
- Updated:
2 days ago
Other companies in: Oil & Gas
Get critical information about thousands of Oil & Gas companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Wintershall Dea México, S. de R.L. de C.V.  (Wintershall Dea México)
-
Wintershall Dea México, formerly known as Deutsche Erdoel Mexico, is the local subsidiary of German E&P company Wintershall Dea. In 2017, the company, as part of a consortium wi...
- Company: Echo Energy Plc  (Echo Energy)
-
Echo Energy plc (Echo), founded in 2005 and headquartered in London, England, is a mid-cap gas exploration company focused in South and Central America. In Bolivia, Echo has a J...
- Company: Oleoducto de los Llanos Orientales S.A., Sucursal en Colombia  (ODL)
-
Colombia's hydrocarbons transportation joint venture Oleoducto de los Llanos Orientales S.A. (ODL) was set up to build and operate a 235km diluted heavy crude oil pipeline conne...
- Company: Grupo Energía Bogotá S.A. E.S.P (GEB)  (Grupo Energía Bogotá)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Equinor ASA  (Equinor)
-
Norway's Equinor, formerly Statoil ASA, is an integrated energy company that is primarily engaged in oil and gas exploration and production. Equinor is present in more than 30 c...
- Company: Repsol Exploración Colombia S.A.  (Repsol Exploración Colombia)
-
Repsol Exploración Colombia S.A. (Repsol Colombia), is a subsidiary of the Spanish multinational firm Repsol S.A based in Bogotá, which owns mining rights over 20 blocks, 12 und...
- Company: Total E&P México S.A. de C.V.  (Total E&P México)
-
Total E&P México S.A. de C.V., a subsidiary of the E&P division of the French firm Total S.A., is a crude oil and natural gas exploration, operator and development company headq...
- Company: Duro Felguera, S.A.  (Duro Felguera)
-
Duro Felguera, S.A. (DF) is a Spanish company specializing in executing turnkey projects for the electric power, industrial, and oil and gas sectors, as well as supplying specia...
- Company: BP Trinidad and Tobago, LLC  (bpTT)
-
BP Trinidad and Tobago LLC (bpTT) is a Trinidadian subsidiary of the British oil company BP P.L.C., established in 1961 with headquarters in Port of Spain to explore, produce an...
News in: Oil & Gas

Colombian Oil and Gas Association receives with concern the announcement that new exploration contracts will not be...
Colombian Oil and Gas Association receives with concern the announcement that new exploration contracts will not be signed

MINEM reactivates LPG Executive Board so that more Peruvians have access to clean fuels
Government studies mechanisms that will allow cheap gas to reach families in a more vulnerable situation