Los Pinos Bio Energy Plant
Electric Power project in Chile, currently in the stage of
Get all the information on the Los Pinos Bio Energy Plant, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Security, Transmission, Lubricants, Generation and Waste. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: The project presented consists of increasing the existing installed generation capacity from 2.8MWe to approximately 9 MW in two stages. The existing facilities correspond to the following: System for cleaning and conditioning biogas. Two electric generation units. Each unit is formed by a specialized internal combustion engine to use biogas and a 1.4 MW electric generator. Security and control system. Electrical substation consisting of 2 transformers of 1,800 KVA and electric power transmission line (LT) from the plant to the point of interconnection to the distribution network. Auxiliary systems consisting of lubricants and coolants tanks, cooling systems, among others. Offices, dining room and control centers. Stage 1 consists of doubling the current installed capacity. For this, it will be necessary to implement: Two electric generation units. Each unit is formed by a specialized internal combustion engine to use biogas and an electric generator from 1.4 MW to 1.5 MW. Security system and additional control. The electrical equipment includes the installation of a 1,800 KVA transformer by motor generator, which is connected to the existing LT. It is not necessary to modify the existing electric transmission line. Stage 2 consists in adding two generation units to stage 1. For this, it will be necessary to implement: System of cleaning and conditioning of the biogas additional to those considered in stage 1. Two units of electric generation. Each unit is formed by a specialized internal combustion engine to use biogas and an electric generator from 1.4 MW to 1.5 MW. Security system and additional control. The electrical equipment includes the installation of a 1,800 KVA transformer by motor generator, which is connected to the existing LT. It is not necessary to modify the existing electric transmission line. Once stage 2 has been executed, the plant will have 6 generation units totaling approximately 9 MW of electrical power. Objective The objective of the project is to obtain electricity through the operation of six generation units of approximately 1.5 MW of power each, through the combustion of recovered biogas from the Concepción Waste Management Center. Currently, the plant has two generation units, with a generation power of 2.8 MW, which includes an electrical substation and a medium voltage transmission line to evacuate power from the plant. Its current status (August 2017) is construction phase, start-up activities. The implementation of the additional units and their auxiliary systems will be carried out in two stages. The first stage consists in complementing the existing facilities (2.8 MW) to complete approximately 6 MW of electric power generation capacity, using the biogas from the landfill. The second stage consists of expanding the generation capacity with two additional units to stage 1, completing approximately 9 MW, using the future capacity to generate biogas from the landfill.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Los Pinos Bio Energy Plant.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Los Pinos Bio Energy Plant.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: Sales Manager
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Chile)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Campo Lindo wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Horizonte wind farm
- Current stage:
- Updated:
4 weeks ago
- Project: Alto Solar Photovoltaic Park
- Current stage:
- Updated:
4 weeks ago
- Project: Copiapó Energía Solar photovoltaic and storage park
- Current stage:
- Updated:
4 weeks ago
- Project: Microsoft Project SCL03
- Current stage:
- Updated:
4 weeks ago
- Project: Terra Energía Renovable park
- Current stage:
- Updated:
4 weeks ago
- Project: Rinconada Solar Photovoltaic Park
- Current stage:
- Updated:
1 month ago
- Project: Capricornio photovoltaic park
- Current stage:
- Updated:
1 month ago
- Project: Andes LNG
- Current stage:
- Updated:
1 month ago
- Project: Las Palmas reservoir
- Current stage:
- Updated:
1 month ago
Other companies in: Electric Power (Chile)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Chilquinta Energía S.A.  (Chilquinta)
-
Chilean power distribution and trading company Chilquinta Energía S.A. serves more than 610,000 clients in the provinces of San Antonio, Petorca, Valparaíso, San Felipe, Quillot...
- Company: Enel X Chile S.p.A.  (Enel X Chile)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Entorno Social Consultores S.A.  (Entorno Social)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
- Company: Ausenco Chile Ltda.  (Ausenco Chile)
-
Ausenco Chile Ltda. Is a subsidiary of the Australian firm Ausenco, which provides process infrastructure and engineering solutions in Chile since 1995. Based Santiago, Ausenco ...
- Company: Asesorías e Inversiones A y M Ltda.
- Company: Edyce S.A.  (Edyce Metalúrgica)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Metso Outotec Chile S.A.  (Metso Outotec Chile)
-
Metso Chile S.A. is the Chilean subsidiary of multinational Finnish company Metso Oyj. It supplies services and solutions mainly to the mining, pulp & paper and recycling indust...
- Company: Barlovento Chile Limitada
- Company: Arroyo Energy Compañía de Energías Renovables Limitada  (Arroyo Energy Compañía de Energías Renovables)
-
Arroyo Energy Compañía de Energías Renovables is the Chilean subsidiary of Arroyo Energy Group, an independent investment manager focused on energy assets in the United States, ...
News in: Electric Power (Chile)

MTR Solar wants to be the market leader in LatAm and sell 1.5GW in solar equipment
The opening of offices in Chile and Colombia is scheduled for the first half of this year.
Chile's Sierra Gorda mine starts operating with 100% renewable energy
The power purchase agreement is for 1,310GWh/y from solar, wind and hydroelectric sources and runs until 2039.