
Management of natural waters before mine dumps
Water & Waste project in Chile, currently in the stage of
Get all the information on the Management of natural waters before mine dumps, a Water & Waste and Mining & Metals project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Lithium, Potash, Antimony, Graphite, Tin, Lithium Hydroxide, Limestone, Borate, Non metallic, Lithium Carbonate, Uranium, Drainage, Lime, Gold, Tungsten, Lead, Alumina / Aluminum, Wastewater treatment plants, Phosphate, Sulphur, Iodine, Lithium Electrolyte, Wastewater, Wastewaters reuse, Minerals & Metals, Cobalt, Coal, Titanium, Rare earth elements (REE), Niobium, Iron ore, Manganese, Other base metals, Copper, Sewer networks, Steel, Industrial wastewater, Vanadium, Illegal mining, Bauxite, Silver, Metallic, Platinum, Diamond, Zinc, Precious stones, Other Precious metals, Metals processing, smelting, refining and metal products , Nickel, Molybdenum, Palladium and Hazardous wastewater. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: Management of natural waters before mine dumps Mining development projects over 5,000 tons/month The Project "Management of Natural Waters before Mine Dumps" is intended to be developed in the Salamanca district, particularly in the sector called Las Hualtatas, which It is part of the Comprehensive Development Project (PID) that the Holder maintains in the Salamanca district. The objective of the Project is to implement a drainage system that allows minimizing the mineral enrichment of the waters coming upstream from the basin and the runoff waters that drain towards the Las Hualtatas dump, which then flow through the Los Pelambres dump. The foregoing, in order to guarantee compliance with the provisions of considering 11.11 of the Environmental Qualification Resolution (RCA) No. 38 of 2004, in relation to acid drainage in the tailings deposits and the pit, which consists of guarantee that “the quality of the surface waters of the Los Pelambres River will be better than or equal to the historical quality of the course of the river”. The ratification of the fulfillment of considering 11.11 must be carried out in node 9, as established by RCA Nº 38/2004. In this way, the Licensee proposes a complementary drainage system, which aims to reinforce the actions that the PID currently maintains regarding the quality of the waters in the Los Pelambres River, following the provisions of the operational measures to be implemented in the phase of operation of the project (considering 11.1 of RCA No. 38/2004). Accordingly, through this Project, the Holder intends to implement works and/or actions that allow guaranteeing what is promised in RCA No. 38/2004. For such purposes, this Project considers the following: · The construction of a drain, with a collection capacity of 200 L/s · The construction of a conduction line, which will allow the water collected by the Drain to be conveyed · The construction of a reception chamber and a discharge chamber, which will allow the entry of the captured water to the conduction line, and its subsequent discharge. · The construction of a collected water discharge, at a defined point belonging to the “Las Hualtatitas” stream, whose confluence with the Pelambres River is located downstream of the Los Pelambres wastewater deposit. The objective of the Project is to implement a drainage system that allows minimizing the mineral enrichment of the waters coming upstream from the basin and the runoff waters that drain towards the Las Hualtatas dump, which then flow through the Los Pelambres dump. The foregoing, in order to guarantee compliance with the provisions of considering 11.11 of the Environmental Qualification Resolution (RCA) No. 38 of 2004, in relation to acid drainage in the tailings deposits and the pit, which consists of guarantee that “the quality of the surface waters of the Los Pelambres River will be better than or equal to the historical quality of the course of the river”. The ratification of the fulfillment of considering 11.11 must be carried out in node 9, as established by RCA Nº 38/2004. In this way, the Licensee proposes a complementary drainage system, which aims to reinforce the actions that the PID currently maintains regarding the quality of the waters in the Los Pelambres River, following the provisions of the operational measures to be implemented in the phase of operation of the project (considering 11.1 of RCA No. 38/2004).
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Management of natural waters before mine dumps.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Management of natural waters before mine dumps.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Construction service apr punahue shipyards, district of dalcahue region of the lakes
- Current stage:
- Updated:
5 months ago
- Project: Replacement service apr pufudi, commune of mariquina, region of the rivers
- Current stage:
- Updated:
5 months ago
- Project: Improvement and extension of service of apr los maitenes de ulmen - second call
- Current stage:
- Updated:
5 months ago
- Project: RURAL DRINKING WATER SYSTEM CONSTRUCTION KM23 ROUTE 240 AYSÉN-COYHAIQUE
- Current stage:
- Updated:
2 years ago
- Project: APR SYSTEM CONSTRUCTION ENSENADA DEL VALLE SIMPSON, COYHAIQUE
- Current stage:
- Updated:
2 years ago
- Project: Extension of the APR Llaicha system to Pollollo and Pergue, Puluqui Island, Calbuco District, Los Lagos Region
- Current stage:
- Updated:
1 year ago
- Project: Improvement and expansion service of apr colony kennedy commune of paine
- Current stage:
- Updated:
1 year ago
- Project: Expansion and improvement of el bollenar, commune of melipilla, province of melipilla economic recovery plan
- Current stage:
- Updated:
1 year ago
- Project: Expansion and improvement of apr gacitúa, commune of isla de maipo, province of cordillera economic recovery plan
- Current stage:
- Updated:
1 year ago
- Project: Comprehensive Improvement of the Rural Drinking Water System in the town of Camarones Commune of Camarones
- Current stage:
- Updated:
2 years ago
Other companies in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Aguas Pacífico SpA  (Aguas Pacífico)
-
Aguas Pacífico SpA, founded in 2016 by the Brazilian investment company Pátria Investimentos in Santiago de Chile, designs, finances, builds and operates seawater desalination p...
- Company: Ingeniería de Protección S.p.A.  (Tarpulin)
-
Tarpulin is a Chilean company dedicated to the rental or sale of temporary or permanent structures on a turnkey basis for the mining, port and industrial sectors in general. Fou...
- Company: Euro Engineering Group Chile SPA
- Company: Yastay Consultores
News in: Water & Waste (Chile)

WOM boasts of its ESG credentials
The telco plans to install solar panels at mobile sites this year and implement pilot projects for the use of green hydrogen and wind turbines.

Who'll pay for developing countries' sustainability transition?
BNamericas talks to Alberto Contardo-Sfeir, founder of Chilean packaging firm Empaque Sustentable, about how the economic model must change tp achi...