
New Deposit of Non-Hazardous Solid Industrial Waste Licancel Plant
Water & Waste project in Chile, currently in the stage of
Get all the information on the New Deposit of Non-Hazardous Solid Industrial Waste Licancel Plant, a Water & Waste project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Industrial waste, Waste, Waste treatment plants and Wastewater. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: The "New Licancel Plant Non-Hazardous Solid Industrial Waste Deposit Project" contemplates the creation of a new deposit to store this type of non-hazardous industrial solid waste resulting from the operation of the Licancel Pulp Mill, which will be located inside the its industrial enclosure, in the commune of Licantén, province of Curicó, VII Region of Maule. Currently, the Plant disposes of its non-hazardous solid industrial waste or surplus by-products in an existing disposal site located inside its industrial property, activity that was favorably qualified in the environment through Exempt Resolution No. 75, of August 3, 2004, of the Regional Commission for the Environment of the Maule Region. Said project consisted basically in the improvement of the solid non-hazardous industrial waste deposit existing at that date in the Plant (hereinafter and indistinctly, "Existing DRIS") 1, increasing its useful life through the overlapping of cells, in vertical form and lateral. In this regard, it is pertinent to point out that, although the DRIS is projected to be contiguous with the current disposal site for industrial waste or byproducts of the plant, within the industrial site of the plant, both disposal sites do not overlap. Thus, this Project does not consider making use of the infrastructure that the current disposal site uses for the collection of its leachates, nor for the management of rainwater that precipitates or runs off the Projected DRIS, as long as they are contemplated independent infrastructure works. Likewise, this Project does not contemplate modifying the control or monitoring measures that were established in RCA N ° 75/2004, cited above. Objective The objective of the Project is the authorization of a new deposit for the storage of non-hazardous solid industrial waste or surplus byproducts generated by the Plant, to be located inside its industrial enclosure, in accordance with applicable environmental and sectoral regulations. This Project will provide operational continuity to the Plant, in terms of the management and disposal of its non-hazardous solid industrial waste and / or its surplus byproducts.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the New Deposit of Non-Hazardous Solid Industrial Waste Licancel Plant.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the New Deposit of Non-Hazardous Solid Industrial Waste Licancel Plant.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: Sales Manager
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Retiro Wastewater Treatment Plant Optimization
- Current stage:
- Updated:
1 month ago
- Project: Improvement of Wastewater Treatment Plant Locality of Los Loros
- Current stage:
- Updated:
1 month ago
- Project: Dam Fundo El Raulí
- Current stage:
- Updated:
1 month ago
- Project: Melifeed Plant Modernization
- Current stage:
- Updated:
1 month ago
- Project: EDELPA industrial plant regularization
- Current stage:
- Updated:
1 month ago
- Project: Solid Waste Management Center, Magallanes
- Current stage:
- Updated:
1 month ago
- Project: San Diego Reservoir
- Current stage:
- Updated:
1 month ago
- Project: Relocation Pila N°3
- Current stage:
- Updated:
1 month ago
- Project: Curepto Wastewater Treatment Plant Improvement
- Current stage:
- Updated:
1 month ago
- Project: Updating of the construction method of the submarine outfall of the Antofagasta sewage final disposal system
- Current stage:
- Updated:
1 month ago
Other companies in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Wood Chile
-
Wood Chile is the local unit of Wood plc, a global provider of project, engineering and technical services for the energy and industrial sectors. It operates in Chile through se...
- Company: Ilustre Municipalidad de Andacollo
- Company: Ilustre Municipalidad de Calama
- Company: Ilustre Municipalidad de Caldera
- Company: Empresa de Montajes Industriales Salfa S.A.  (Salfa Montajes)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by BNamericas’ content team. However, it may have been au...
- Company: Besalco Construcciones S.A.  (Besalco Construcciones)
-
Besalco Construcciones, a subsidiary of Chilean construction company Belsaco, engages in engineering, architecture, infrastructure construction, including roads and tunnels, and...
- Company: Phoenix Contact Chile
- Company: BIOS Mining & Infrastructure  (BIOS MI)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
News in: Water & Waste (Chile)

Chile environmental submissions fall over 40% in H1
Investments fell 20.2%, due to the energy and mining sectors, while figures for transport and port infrastructure increased.

Chile seen to be on the right sustainability track
BNamericas talks to Fundación Chile's sustainability chief Claudia Razeto about the constitutional proposal's environmental provisions and the foun...