
San Diego Reservoir
Water & Waste project in Chile, currently in the stage of
Get all the information on the San Diego Reservoir, a Water & Waste project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Dams. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: Embalse San Diego Dams and reservoirs The Project will be located within the Fundo San Diego, owned by Agrícola El Boldo SpA., located in the rural area of the Peralillo commune, Colchagua province, Libertador Bernardo O'Higgins region, approximately 4.3 km to the southeast of the town of Peralillo. The Project corresponds to the construction and operation of a seasonal regulation reservoir with a compacted earth wall 542 m long and 20.32 m maximum height measured along the axis of the wall from the natural terrain to the crest. The reservoir will store a useful volume of 932,182 m3 and 1,002,188 m3 of volume in flood. The maximum flooded surface in flood will be 10.15 ha. The work is located in the La Higuera stream, corresponding to a pluvial stream that presents favorable conditions and a good wall-water relationship for the location of the wall. For the filling of the reservoir, the construction of intakes in natural or artificial channels is not considered, since the existing irrigation infrastructure in Fundo San Diego and water use rights of the Holder consisting of 5,566 shares of water from the Association of Canalistas del Canal Población, shares that are delivered in a regulated manner to Fundo San Diego by the association of canalists through an existing partitioning framework, and then are conducted to the fund through existing irrigation pipes until they derive to Dam 3, an existing dam of intermittent filling at Fundo San Diego, point at which a Pump Plant will be set up to boost water resources to fill the future reservoir. The discharge/delivery process to the farm's irrigation system from the San Diego reservoir will be gravitational and through the same drive pipe to Dam 3. The construction of the reservoir will take place within an estimated period of 4 months, and will require the fitting out of a 411 m2 slaughter facility, within which supply yards and non-hazardous solid waste will be temporarily fitted out, in addition to the fitting out of chemical toilets and parking lots. After the completion of the construction of the reservoir, the work facility will be dismantled and removed from the Project area. According to the nature of the Project, the operation of the reservoir is indefinite, subject to a series of monitoring and maintenance. The objective of the Project is the construction and operation of a seasonal reservoir with a compacted earth wall that allows the accumulation of water, which will be used to satisfy and provide water certainty to the water requirements of the productive system of Fundo San Diego.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the San Diego Reservoir.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the San Diego Reservoir.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Construction of APR System Viluco, Collin and Vega Redonda, Vilcun
- Current stage:
- Updated:
2 years ago
- Project: Reposicion Parcial APR Hualacura, Comuna de N. Imperial
- Current stage:
- Updated:
2 years ago
- Project: Improvement and expansion of the APR system Villa Coihueco, Galvarino commune, Araucanía region (drought)
- Current stage:
- Updated:
1 month ago
- Project: Construction system apr radalco, curacautin
- Current stage:
- Updated:
1 year ago
- Project: Construction system apr pelon mapu, victoria
- Current stage:
- Updated:
1 year ago
- Project: Improvement and expansion of the Molino-Ventana del Alto apr system to Santa Laura, Teno
- Current stage:
- Updated:
1 month ago
- Project: Port infrastructure multipurpose in Puerto Williams
- Current stage:
- Updated:
4 years ago
- Project: Extension and Improvement Service of APR San Manuel Comuna de Melipilla Province of Melipilla
- Current stage:
- Updated:
3 years ago
- Project: Improvement and expansion of the apr lo de lobos system, commune of rengo
- Current stage:
- Updated:
1 month ago
- Project: System improvement apr roma san jose los lingues, san fernando
- Current stage:
- Updated:
1 year ago
Other companies in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Aguas Pacífico SpA  (Aguas Pacífico)
-
Aguas Pacífico SpA, founded in 2016 by the Brazilian investment company Pátria Investimentos in Santiago de Chile, designs, finances, builds and operates seawater desalination p...
- Company: Ingeniería de Protección S.p.A.  (Tarpulin)
-
Tarpulin is a Chilean company dedicated to the rental or sale of temporary or permanent structures on a turnkey basis for the mining, port and industrial sectors in general. Fou...
- Company: Euro Engineering Group Chile SPA
- Company: Yastay Consultores
News in: Water & Waste (Chile)

Chilean region to resubmit EIA for waste management project
The Magallanes authorities will compile additional background information for the US$20mn project.

Chile’s regional governments take first infra steps
Over a year after a de-centralization push, regional governments are starting projects, but some grapple with scarce resources, a webinar was told.