Loading...

We found 5,214 Results
Click & drag to scroll 
  • Costa Norte project

    8/17/18
    The project involves the construction of a combined-cycle gas-fired thermoelectric power plant and a 180,000m3 terminal for liquefied natural gas (LNG) from the US, which will be used to supply the facility. The plant will produce...

  • Minas-Rio

    8/16/18
    The Minas-Río iron ore project will comprise an open pit mine, a beneficiation plant producing high-grade pellet feed, a 525km slurry pipeline running through 32 municipalities in Minas Gerais and Rio de Janeiro states, and an iron...

  • Oso field

    8/16/18
    The Bear field corresponds to a conventional deposit that has 19 2D seismic lines and 198km2 of 3D seismic. The field has 101 producing wells and belongs to block 7....