This information is available only to subscribers.
Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Belo Horizonte metro expansion

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
Current Stage: Early design & engineering
Start: 04/2013
In Construction
Operation
Project Details

Description

The initiative involves a concession to expand and operate its state capital Belo Horizonte metro system. The concession entails expanding line I, constructing, operating and maintaining line II (between the Barreiro and Nova Suíça stations), and operating and maintaining line III (between the Savassi and Lagoinha stations). The city's metro consists of one 28.2km line with 19 stops running between the Eldorado and Vilarinho stations.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Related Companies

Name Sector Country Relation
Locked content
Project Owners
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Belo Horizonte metro expansion
Project Type
Metro
Development Phase
Early design & engineering
Project Status
Active
Project Capacity
 Metro
Investment
US$ 1.51bn
Lifespan
30
Location

Expansion works are planned for lines 1, 2 and 3 of Belo Horizonte's metro system in Brazil's Minas Gerais state.

* The map coordinates represent the approximate latitude and longitude, and not the exact location, of the project. 


Locked content
Owner / operator
Locked content
Technical Director
Locked content
CEO
Dear visitor, this table includes insights that is only available for subscribers