
Argentina opens 3 bids for Salado River widening works

Argentina’s public works ministry opened three bids for widening works on section 2 of the fourth stage of the Salado River project in Buenos Aires province.
But, in line with recent offers, they were significantly higher than the reference budget of 12.7bn pesos (US$86.3mn).
The tender is divided into sub-section A involving 4.12bn pesos and 8.79km, sub-section B, 3.7bn pesos and 10km, and sub-section C for 4.8bn pesos and 14.6km.
Offers were for all sub-sections and came from Chediack-Ecodyma (27.3bn pesos), Centro Construcciones (27.1bn pesos) and Dragados y Obras Portuarias (26.7bn pesos).
Stage 4 involves four sections, three of which are already in execution.
The entire project covers works along 212km, involving 36.6bn pesos. It is among 120 strategic water and infrastructure works of the US$6.5bn Argentina Grande program.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
News in: Water & Waste (Argentina)

Argentine province details bidding schedule for February
This month's most relevant work in Entre Ríos would be a wastewater treatment plant for the city of Concordia, which requires an investment of US$3...

Argentina: Team Europe - EIB invests US$210mn into flood protection and vaccine programmes
Of the total funding, US$100mn will be for vaccines, while US$110mn will be for flood control works on the Salado River.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Argentina)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: RAINWATER DRAINS MARCOS SASTRE BASIN SECOND STAGE
- Current stage:
- Updated:
1 year ago
- Project: AVIA TERAI DRINKING WATER SYSTEM
- Current stage:
- Updated:
1 year ago
- Project: POTABLE WATER NETWORK OPEN DOOR LUJÁN STAGE 1
- Current stage:
- Updated:
1 year ago
- Project: NEIGHBORHOODS SYSTEM OF CLOACAL NETWORKS V. DEL ROSARIO AND V. MABEL CITY OF FORMOSA
- Current stage:
- Updated:
2 years ago
- Project: Santiago del Estero Capital
- Current stage:
- Updated:
4 years ago
- Project: INTERNAL WORKS CUENCA LAGUNA LA PICASA REGULATION WORKS RESERVOIR N3
- Current stage:
- Updated:
2 years ago
- Project: COMPREHENSIVE DRAINAGE AND FLOOD CONTROL MANAGEMENT PLAN IN THE CITY OF QUILMES STAGE 1 TRUNK DRAINAGE NETWORK SUB STAGE 1: OTAMENDI TRUNK COLLECTOR AND SECONDARY BRANCHES
- Current stage:
- Updated:
2 years ago
- Project: RAIN DRAINS EZPELETAVICTORIA BASIN ENTRE RIOS PROVINCE
- Current stage:
- Updated:
2 years ago
- Project: VILA CULULU AND CAÑADA SUNCHALES CANAL REFURBISHMENT
- Current stage:
- Updated:
2 years ago
- Project: GRAL POTABILIZATION PLANT. SAN MARTÍN LIME WATER SYSTEM
- Current stage:
- Updated:
2 years ago
Other companies in: Water & Waste (Argentina)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Unión Temporal Cartellone Construcciones Civiles S.A.- Goetze Lobato Engenharia Ltda.  (UT Cartellone - GEL)
-
Unión Temporal Cartellone Construcciones Civiles S.A.- Goetze Lobato Engenharia Ltda. is a consortium formed in 2018 by these two construction companies, Argentine and Brazilian...
- Company: Sial Ingeniería
- Company: Comisión Mixta del Río Paraná  (COMIP)
-
Commission made up of Argentinean and Paraguayan officials charged with studying and evaluating the technical and economic possibilities of taking advantage of Paraná river's re...
- Company: CEAS S.A.
- Company: Ministerio de Ambiente y Desarrollo Sostenible de la República Argentina  (MAyDS)
-
The Ministry of Environment and Sustainable Development (Ministerio de Ambiente y Desarrollo Sustentable, MAyDS) was established in 2006 and reformed in 2015 by the Argentine St...