El Caracol pumping plant

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Operation
Current Stage In operation
Project Details

Description

The El Caracol stormwater pumping plant will have capacity to move 40m3/s and is required to reinforce the drainage system and avoid flooding in Mexico City. The project forms part of the first phase of the Emisor Oriente drainage tunnel. Construction of the pumping station was tendered in two parts. The first phase, which involves subsurface works, was awarded to ICA subsidiary Cotrisa. The second phase, which involves work above ground, was awarded to a consortium including La Peninsular Compañía Constructora and Alcance Total, both part of Grupo Hermes, as well as Aqualia Infraestructuras.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Principal Works

Locked content
Dear visitor, this table includes insights that is only available for subscribers

Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Concessionaire/operator
Locked content
Construction
Locked content
Construction
Locked content
Construction
Locked content
Concessionaire/operator
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
El Caracol pumping plant
Project Type
Flood control
Development Phase
In operation
Project Status
Active
Project Capacity
 Flood control
Investment
US$ 205mn
Completion Date
2013
Location

The plant will be located in Lake Texcoco federal area,  Ecatepec municipality, Mexico state, Mexico.

* The map coordinates represent the approximate latitude and longitude, and not the exact location of the project.


Locked content
Owner / operator
Locked content
Manager, Potable Water & Sanitation, Conagua
Locked content
General Coordinator, Potable Water Supply & Sanitation Projects
Locked content
Potable water and sewerage studies and projects management
Dear visitor, this table includes insights that is only available for subscribers