This information is available only to subscribers.
Start a free trial, to unlock the full potential of a subscription to BNamericas.
Already a subscriber? Please, login.

Emisor Oriente drainage tunnel

Project Stages

The development stages in the projects are displayed in the standard sequence for the industry. However, projects may be developed in a different sequence because of corporate decisions or events that push the owner to repeat stages. To access the full details of this project’s history please explore its milestones


Early Works
In Construction
Current Stage Under Construction
Start: 11/2007
Completion: 12/2019
Operation
In operation
Start:12/2019
Project Details

Description

The Emisor Oriente drainage tunnel involves the design and construction of an underground wastewater treatment tunnel in Mexico City. The tunnel will be an alternative to the existing Emisor Central drainage tunnel. The tunnel has been divided into six stretches, each measuring 10km.

Only BNamericas Subscribers Can Access This Information.
Subscribe to BNamericas to gain better insight into project development and contract opportunities in Latin America.
  • Early-stage and under-development projects throughout the region
  • Project coverage focused on biggest investments in each country and sector
  • Project milestones highlighting planned and unplanned developments
  • Sales contacts within operators and contracted companies
  • Access to experienced research staff
  • Risk analysis of cost increases, scheduling conflicts and regulatory environment
Already a subscriber? Please, login

Milestones Log and News


Principal Works

Locked content
Dear visitor, this table includes insights that is only available for subscribers

Related Companies

Name Sector Country Relation
Locked content
Project Owners
Locked content
Consulting
Locked content
Engineering
Locked content
Engineering
Locked content
Supplier
Locked content
Consulting, Controlling
Locked content
Engineering
Locked content
Construction
Dear visitor, this table includes insights that is only available for subscribers

  • * Figures and dates are as per the latest publicly available information, as well as information gathered by BNamericas reporters and analysts and are subject to change.

  • * Changes to original budget estimates are shown as the total figure available and may include interest, working capital, inflation adjustments and other contingencies in addition to capital expenditure.

  • * Amounts and overall results are shown in US dollars unless otherwise stated.

  • * BNamericas does not guarantee the sequence, accuracy, adequacy, completeness or availability of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. There are no express or implied warranties. In no event shall BNamericas, its agents, directors, officers, employees, representatives, successors, and assigns be liable for any damages of any nature in connection with BNamericas content.


Key Specs

Full Name
Emisor Oriente drainage tunnel
Project Type
Water pipelines
Development Phase
Under Construction
Project Status
Active
Project Capacity
62,000  m (Meters)  Water pipelines
Investment
US$ 1.23bn
Completion Date
2019
Location

The Emisor Oriente drainage tunnel will start at the DF-Ecatepec municipal border, run along one side of lake Zumpango and end at El Salto river in Mexico's Hidalgo state.

* The coordinates indicated on the map represent an intermediate point between the start and end of the project.


Locked content
Owner / operator
Locked content
CEO
Locked content
Technical Manager
Locked content
General Director
Locked content
Engineering Manager
Locked content
Investor Relations
Dear visitor, this table includes insights that is only available for subscribers