Central to Gas El Peñón
Electric Power project in Chile, currently in the stage of
Get all the information on the Central to Gas El Peñón, a Oil & Gas and Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Photovoltaic and Bunker oil/Diesel oil. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: El Peñón Gas Power Plant Power generating plants greater than 3 MW The Project consists of the construction and operation of a Gas Power Plant that seeks to operate as a complement to the intermittency of Non-Conventional Renewable Energy Plants (NCRE). Said Power Plant will be located within land owned by a subsidiary of the Holder, adjacent to the “El Peñon Power Plant” of Enlasa Generación Chile SA This Project will not introduce modifications to the existing Power Plant. The Project will consist of 12 Liquefied Petroleum Gas (hereinafter LPG) generator engines. Each unit will have a power of 1.72 MW, so the Power Plant will have a total generation capacity of 21 MW, in addition there will be a step-up transformer for every 2 motors (completing a total of 6 transformers) of 4.5 MVA each. . Each generating unit has its own gas exhaust system, which joins a final evacuation chimney. In total, a total of 3 chimneys of 12 meters each, grouped every 4 units, is considered. In order to store and supply the fuel required for the operation of the engines, the Project considers an LPG storage system consisting of 4 mounded tanks of 114 m3 each, which will be connected to the generating units through a network. surface of approximately 180 meters, in addition, it considers a sector of heat exchangers called vaporizers whose objective is to transform the fuel that will finally be used by the engines from a liquid to a gaseous state. For the storage and distribution of LPG, the implementation of two unloading stations that will be located next to the diesel tanks of the existing Power Plant is contemplated. This area has pavement and enough turning so that trucks can transit and connect to the pumping station towards the LPG tanks. The fuel (LPG) will be acquired according to the generation needs of the Project, and will be provided by companies that have the corresponding authorization to transport this type of fuel. The energy generated by the Power Plant will be evacuated through a Medium Voltage Line (LMT) of approximately 250 meters in length to the existing substation of the El Peñón Power Plant, for subsequent delivery to the National Electric System. Finally, it should be noted that within the infrastructure required by the Project during its operation phase, it is contemplated to use part of the existing works of the El Peñón Power Plant, such as: offices, toilets, control room, warehouses and workshops. It should be noted that the use of these buildings will not generate changes in the operation of the existing plant. The objective of the Project corresponds to the generation of electrical energy through the operation of gas engines, as a complement to the intermittency of the Non-Conventional Renewable Energy Plants. From this objective, the following specific objectives emerge - Build and operate an electricity generation plant that works by means of LPG engines with a maximum capacity of 21 MW. - Build and operate a storage system for LPG. - Build a medium voltage power transmission line that allows the power produced in the motors to be conveyed to the existing substation.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Central to Gas El Peñón.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Central to Gas El Peñón.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Chile)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Los Lagos Hydroelectric Power Plant
- Current stage:
- Updated:
4 days ago
- Project: Gabriela photovoltaic park
- Current stage:
- Updated:
4 days ago
- Project: Horizonte wind farm
- Current stage:
- Updated:
4 days ago
- Project: Los Andes photovoltaic park expansion, phase III and IV
- Current stage:
- Updated:
7 days ago
- Project: Los Cóndores hydro plant
- Current stage:
- Updated:
7 days ago
- Project: Blue Sky photovoltaic proyect (Ex Crucero Este, Blue Sky)
- Current stage:
- Updated:
7 days ago
- Project: Víctor Jara photovoltaic park
- Current stage:
- Updated:
7 days ago
- Project: Infraestructura Energética Mejillones conversion to natural gas
- Current stage:
- Updated:
7 days ago
- Project: Las Arcillas natural gas plant
- Current stage:
- Updated:
1 week ago
- Project: Parinas - Nogales transmission line
- Current stage:
- Updated:
1 week ago
Other companies in: Electric Power (Chile)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Andritz Chile Ltda.
-
Andritz Chile Ltda., a subsidiary of Austrian technology group Andritz AG, supplies technology and services for a variety of industries, including pulp and paper, hydropower, mi...
- Company: HIF SpA  (HIF)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
- Company: Latin America Power S.A.  (Latin America Power (LAP))
-
Founded in 2011, Chile's Latin America Power S.A. (LAP) is a renewable energy company with projects and operations in Chile and Peru. In Chile it operates the run-of-river hydro...
- Company: Besalco Energía Renovable S.A.  (Besalco Energía Renovable)
-
*This is an archived company in the BNamericas database. If you need an update on this company and its operations, please Ask Us.* Besalco Energía Renovable S.A. (Besalco Energí...
- Company: Statkraft Chile Inversiones Eléctricas Ltda.  (Statkraft Chile)
-
Since 2004, Statkraft Chile Inversiones Eléctricas Ltda. has being operating as an electric power generation and transmission company in Santiago. Currently, it builds and devel...
- Company: DRS Gestión Integral de Proyectos Ltda.  (DRS Gestión Integral de Proyectos)
-
La descripción contenida en este perfil fue extraída directamente desde una fuente oficial y no ha sido editada ni modificada por los investigadores de BNamericas, pero puede ha...
- Company: DLS Ingenieros Consultores Ltda.  (DLS Ingenieros Consultores)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Siemens S.A. Chile  (Siemens Chile)
-
Siemens S.A. Chile (Siemens Chile) is the local subsidiary of German technology company Siemens A.G. The company has been present in Chile since 1907 and is based in Santiago. I...
- Company: Besalco S.A.  (Besalco)
-
Chilean construction and engineering group Besalco S.A. (Besalco) is controlled by the Bezanilla-Saavedra family and was established in 1944. With operations in three countries,...
News in: Electric Power (Chile)
Codelco seeks renewable energy supplier
The Chilean state miner also signed an agreement with generator AES Andes to replace coal-based electric power with renewable energy at two of its ...

Executive Director of the SEA and Chilean Hydrogen Association address key aspects related to development of projects
This Thursday, H2 Chile met with the executive director of the SEA and her team to talk about the main challenges of the green hydrogen industry, a...