Doña Luzma Central
Oil & Gas project in Chile, currently in the stage of
Get all the information on the Doña Luzma Central, a Oil & Gas and Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Transmission Lines, Substations and Bunker oil/Diesel oil. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: Doña Luzma Power Plant Power generation plants greater than 3 MW The Doña Luzma Power Plant Project consists of the construction and operation of a diesel backup electric power generation plant that will inject its generation into the National Electric System through the Substation (S/E ) Falcons. The project, located in the commune of Marchigue, includes the generation plant, a booster substation and a transmission line. The plant will be made up of 24 diesel power generation units (10 units of 2.1 MW and 14 units of 1.4 MW), making up a total power of 40.6 MW. Likewise, 5 tanks will be built for the storage of Diesel fuel of 90 m3 each, which will be supplied by 30 m3 trucks from the Marchigue area. The plant will have a step-up S/E that will increase the voltage from 23 kV to 66 kV. The generating units will be connected to this substation through an internal 23 kV overhead line. The connection from the lift S/E to the Alcones S/E will be through a 3.55 km long 66 kV High Voltage (HV) line, which will run through an Easement Strip approximately 20 m wide. The workforce throughout the construction stage will be a total of 40 people. For the operation will require 6 people. Work shifts will be 8 hours, there will be dressing rooms and bathrooms for such purposes. The drinking water supply in the construction will be through dispensers, while for the operation there will be a 10,000 L storage tank, which will be supplied by a company authorized by the Health Service of the Libertador General Bernardo O'Region. Higgins, through cistern trucks from Santa Cruz. During construction, to have electricity, it will be necessary to use a 100 kVA generator set, fed by a 500 L fuel tank. During the operation stage, the Power Plant may generate or use the network for its own consumption, the energy necessary for its own operation. During the Construction phase, the project will have chemical toilets maintained by a pit cleaning truck authorized by the SISS of the Rancagua commune. Meanwhile, during the Operation phase, conventional toilets will be used, which will be connected by pipes to a sealed septic tank system, which will also be maintained by trucks and personnel authorized by the SISS of the Rancagua commune (or a nearby commune). that has authorized service). The objective of the Project consists of the construction and operation of a 40.6 MW Power Plant, powered by Diesel fuel No. 2, in the Marchigue sector, intended to supply electricity to the facilities of the National Electric System through of the S/E Alcones.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Doña Luzma Central.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Doña Luzma Central.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Oil & Gas (Chile)
Get critical information about thousands of Oil & Gas projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: X-1 Carpenter Flow Line to Cisne Sur Flow Transfer Station
- Current stage:
- Updated:
3 years ago
- Project: Hydraulic stimulation in strata formation with Favrella Kosten well x-1
- Current stage:
- Updated:
3 months ago
- Project: Flow Line From Wells Cabaña Oeste Zg1 / zg2, To Pad Cabaña Oeste 1 In Arenal Block
- Current stage:
- Updated:
3 years ago
- Project: Incorporation of New Hydraulic Fracture for the PAD Cut Creek ZG-C Well Satellite 8
- Current stage:
- Updated:
3 years ago
- Project: Construction of Monte Aymond 35 well flow line and Monte Aymond 21 reinyector well rating
- Current stage:
- Updated:
3 months ago
- Project: Hydraulic fracture in formation The waterfall Jauke x-1
- Current stage:
- Updated:
3 months ago
- Project: Enabling wells Kimiri Aike 4 and Guanaco x-4
- Current stage:
- Updated:
3 months ago
- Project: Biobío refinery new process unit
- Current stage:
- Updated:
3 years ago
- Project: Construction of well flow lines Uaken x-1
- Current stage:
- Updated:
2 years ago
- Project: Extraction of aggregates, Maipo river
- Current stage:
- Updated:
3 years ago
Other companies in: Oil & Gas (Chile)
Get critical information about thousands of Oil & Gas companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Innovación Energía S.A.  (Inersa)
-
Innovación Energía S.A. (Inersa) is a society between Energía Latina S.A. and Gasco S.A. established in 2016 to develop and exploit electricity generation projects in Chile. Bas...
- Company: SRK Consulting (Chile) S.A.  (SRK Consulting Chile)
-
SRK Consulting (Chile) S.A. is a subsidiary of the South African consulting company SRK Consulting (Global) Limited (50%). It was constituted in 1994 to offer advice to mining a...
- Company: GasAtacama Chile S.A.  (GasAtacama Chile)
-
GasAtacama Chile is a gas transporter and energy generator that owns 781MW of gas-fired power generation on SING grid and more than 1,160km of gas pipelines. Its gas transportat...
- Company: Gradian SpA  (Gradian)
-
The Chilean company Gradian provides topography and geometry services to the mining, energy, infrastructure, and agriculture sectors, among others. Its services include orthomos...
- Company: GeoExplo Limitada  (GeoExplo)
- Company: Vía Limpia SpA  (Vía Limpia)
-
Vía Limpia Spa, incorporated in Santiago de Chile in 1988, a subsidiary of Chilean firm Compañía de Petróleos de Chile Copec S.A., one of the main subsidiaries of conglomerate E...
- Company: GNL Penco SpA  (GNL Penco)
- Company: Inti Pacific 2 S.p.A.  (Inti Pacific 2)
-
Inti Pacific 2 S.p.A. is a subsidiary of Chilean energy project developer Pacific Solar S.A., and it develops the Pacific Photovoltaic project, which comprises the installation ...
- Company: Brass Engineering
- Company: Mediciones Geolec de Chile Ltda.  (Schlumberger Chile)
-
Schlumberger Chile provides oilfield services and products. In 1945, it logged its first oil well in Chile, Manantiales S-1. Today, Schlumberger Chile operates under the name Me...
News in: Oil & Gas (Chile)

Synergies to establish a green hydrogen export corridor from Chile to Europe
The Netherlands is organizing a green H2 Trade Mission from November 7th to 11th 2022 to Chile. Leading Dutch companies from the energy sector will...

Turbine-maker Vestas offering green hydrogen one-stop shop, eyeing Chile
“Some people might call it a turnkey solution, all the way from renewables up to the green hydrogen molecule,” says Anders Tuxen, Denmark-based Ves...