Chile
Project Profile

Picaflor Blue Photovoltaic Park

Electric Power project in Chile, currently in the stage of Blurred

Get all the information on the Picaflor Blue Photovoltaic Park, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Photovoltaic. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: Picaflor Azul Photovoltaic Park Power generation plants greater than 3 MW The project consists of the installation, operation and eventual closure of a photovoltaic solar plant with an installed power of 3.6 MWp, made up of 10,080 polycrystalline silicon panels with a power of 400 W each. one, mounted on galvanized steel metal structures composed of 120 tracking supports on an axis or tracker (daily east-west), which are fixed to piles driven directly into the ground at a depth of approximately 1.5 m , without the need to use concrete foundations, which allows the physical-chemical characteristics of the soil to be preserved. The photovoltaic park will be subdivided electrically into six (6) units, each with approximately 0.5 MW of generation. Each generating unit will consist of one (1) 0.8/13.2 KV – 0.6 MVA transformation center, mounted on a reinforced concrete slab installed directly on the ground, without the need to use deep foundations. The purpose of the transformer is to raise the output voltage of the inverters to the appropriate level for power distribution. The installation of a total of 30 inverters of 100 kW each, located in front of the trackers to which said inverters are connected, is also considered. All low voltage (LV), medium voltage (MV) and weak current (DC) wiring will be underground in compacted trenches at least 60 cm deep. The MV wiring will be raised to a pole projected in the eastern sector of the property, where it will be connected, together with the other interconnection equipment, to the existing distribution power line, the "Linares Sur" feeder of the "Linares Norte" Substation, belonging to the to the company “Luz Linares SA” The Photovoltaic Park will be delimited throughout its perimeter by a rigid fence of the Acmafor type or similar crowned with barbed wire. The facilities will also have auxiliary equipment for closed-circuit security cameras (CCTV) and monitoring of all equipment and system parameters through the SCADA system, which will allow remote control and inspection of the Project. The energy surpluses will be injected into the National Electric System[1] (SEN). The Project, classified as a minor civil work, is part of the Non-Conventional Renewable Energies (NCRE) initiative, defined by Law 20,257 and its subsequent amendments, which is being promoted by the government and other agencies, to diversify the energy matrix from the country. The social, environmental and economic benefits that the Project will contribute during its useful life to the commune where it will be located, fall into its nature as it is defined as a Small Distributed Generation Means (PMGD), eliminating possible environmental impacts associated with large generation projects. generation, providing work and clean energy to the community and the sector, in a sustainable manner and at a competitive price. [1] System composed of the old Interconnected Central (SIC) and Interconnected North Great (SING) systems. The objective of the Project is the generation of renewable electricity from photovoltaic solar technology.

Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.

Related companies

Get valuable information on companies involved in the Picaflor Blue Photovoltaic Park.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Picaflor Blue Photovoltaic Park.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Sales Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power (Chile)

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power (Chile)

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Bechtel Chile Ltda.  (Bechtel Chile)
  • Bechtel Chile Ltda., the local unit of the US engineering and construction company, offers services to clients for the development, engineering, construction and administration ...
  • Company: Compañía General de Electricidad S.A.  (CGE)
  • Chilean holding Compañía General de Electricidad S.A. (CGE) is engaged in electric power generation, transmission, distribution and trading; and natural gas distribution for the...
  • Company: Imelsa S.A.  (Imelsa)
  • Imelsa S.A. is a Chilean company dedicated to the development, construction, operation and commercialization of electric power projects. The company, founded in 2002, offers eng...
  • Company: Orion Power
  • Orion Power is a Chilean company based in Santiago, aimed at the comprehensive development of solar photovoltaic generation projects from its origin, including licensing, commis...
  • Company: Sustentable S.A.  (Sustentable)
  • Chilean environmental management and consultancy provider Sustentable S.A. aims to achieve higher energy efficiency in investment projects, and public and private initiatives. F...
  • Company: POCH by WSP  (POCH)
  • The description included in this profile was taken directly from an official source and has not been modified or edited by BNamericas’ content team. However, it may have been au...

Project information

Full name
Picaflor Blue Photovoltaic Park
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred