
Peru power watch: Concession call, solar dispatch, grid costs

Peru’s investment promotion agency ProInversión modified the timetable for the concession process of transmission projects Belaunde Terry-Tarapoto Norte, San José-Yarabamba, Piura Nueva-Colán, Lambayeque Norte, Chiclayo Oeste-La Niña/Felam and Piura Este.
The deadlines to pay the participation fee and present qualification documents were pushed back to June 5 and 12, respectively.
***
Energy and mining investment regulator Osinergmin issued a connection mandate for Parque Fotovoltaico Iquitos’ 20MW Milagros solar project.
The photovoltaic park, which secured the definitive transmission concession last year, is now permitted to connect to Electro Oriente’s 60kV Santa Rosa substation in the northern Amazon region of Loreto.
***
Osinergmin also reported it will hold virtual public hearings January 19-20 where 2023-27 power grid connection cost proposals submitted by distributors will be presented. Information is available here.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
News in: Electric Power (Peru)

Peru: Ingemmet holds a meeting with the Minem, Regional Government of Tacna and EGESUR, to promote geothermal energ...
Ingemmet holds a meeting with the Minem, Regional Government of Tacna and EGESUR, to promote geothermal energy in the country

Brazil set to boost regional integration
Finance minister Fernando Haddad told a panel at Davos that Latin America has immense potential, especially regarding clean energy.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Peru)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: La Niña - Piura transmission line
- Current stage:
- Updated:
1 month ago
- Project: Pampa Caracoles wind park
- Current stage:
- Updated:
1 month ago
- Project: Apurímac 2500 hydro plant
- Current stage:
- Updated:
1 month ago
- Project: Emma wind farm
- Current stage:
- Updated:
1 month ago
- Project: Huánuco-Tocache-Celendín-Trujillo transmission line, expansions and associated substations
- Current stage:
- Updated:
1 month ago
- Project: Celendín-Piura transmission line, expansions and associated substations
- Current stage:
- Updated:
1 month ago
- Project: Pampas wind farm
- Current stage:
- Updated:
1 month ago
- Project: Lupi solar park
- Current stage:
- Updated:
1 month ago
- Project: Paltuture dam
- Current stage:
- Updated:
1 month ago
- Project: Tintaya - Azángaro transmission line
- Current stage:
- Updated:
1 month ago
Other companies in: Electric Power (Peru)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Grenergy Perú S.A.C  (Grenergy Perú)
-
Grenergy Perú is a subsidiary of the Spanish company Grenergy and was established in 2014. In Latin America Grenergy has over 1,000MW in development in wind and solar projects. ...
- Company: ENGIE Energía Perú S.A.  (ENGIE Energía Perú)
-
Peruvian generator and transmission firm ENGIE Energía Perú operates power generation and transmission assets, including five thermal power plants, two hydropower plants, one so...
- Company: CMPC Perú
- Company: Klohn Crippen Berger Perú
- Company: Embajada de Canadá en Perú / Canadian Embassy - Peru
-
The Canadian Embassy in Peru is dedicated to strengthening bilateral relations between the two countries in the areas of trade and investment, development cooperation, poverty r...
- Company: Santa Isabel Solar S.A.C.  (DVP SOLAR)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...