Modification of Residual Materials Reconversion Plant, RILESUR Ltda.
Water & Waste project in Chile, currently in the stage of
Get all the information on the Modification of Residual Materials Reconversion Plant, RILESUR Ltda., a Water & Waste project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Industrial waste, Waste and Waste treatment plants. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: This EIA corresponds to a regularization of the project approved by Exempt Resolution No. 0005 dated January 7, 2009 (hereinafter RCA No. 0005/2009), of the Regional Environmental Commission, Los Ríos Region. The original project considered the generation of biosolids, through a process of anaerobic co-digestion of organic and inert residual materials. Its execution was raised in stages; Thus, of the 44 ditches or biodigesters designed (41 for solid and semi-solid waste, and 3 for liquid waste), a total of 19 have been built to date, considering one of smaller size for the Nitrification System. The remaining 25 biodigesters will be built to the extent that the demand warrants it. While these are not being built, part of that land will be used for activities subject to approval by the Environmental Authority in the present environmental assessment procedure. Through the Environmental Compliance Program, the presentation of an Environmental Impact Statement (EIS) was established to regularize the initial project. That is why on December 18, 2015, the DIA "Regularization of Improvements to the Residual Materials Conversion Plant Project" was presented, with its subsequent Addenda (October 24, 2016) and Complementary Addendum (May 10, 2017), which was finally classified as unfavorable according to Exempt Resolution No. 41-2017. The presentation of this EIA is carried out within the framework of the actions that are part of the Environmental Compliance Program, approved by the Superintendency of the Environment through Resolution No. 6 ROL N ° D 032 2015, dated September 28, 2015, through which has been provided a mechanism and deadlines to fully comply with environmental regulations by RILESUR Ltda. The modification that is presented for evaluation, is part of the scope of adjustments and improvements introduced in the operation. The Project considers the introduction of an aerobic phase for the management of biosolids and the liquid fraction, as part of a process of continuous improvement of the productive activity. As a result of this, the reconversion of waste is optimized, generating as products a biosolid and a liquid fraction (nitrogenous liquid) that can be used as soil improvers, which represents a series of qualitative improvements in terms of products. The indicated aerobic phase contemplates in turn two stages that are detailed below as active phase and phase of maturation and stabilization, for which the property belonging to RILESUR Ltda. And a leased land located adjacent to the facilities will be used. of the Reconversion Plant. The location of this modification is justified by the existence of the project in operation, which also has RCA and several sectoral permits already processed and granted. The Residual Materials Conversion Plant is located in Plot 4, Lot 4-C owned by RILESUR Ltda., And in the adjacent Lot 4-A leased to the company Transportation of Cargo H and H Ltda. Both lots are located in the parcelization El Llolly - Santa Laura, in the commune of Paillaco, province of Valdivia, Los Ríos Region. The project is developed in a total area of 7 hectares. Currently, 5 hectares are qualified environmentally friendly by the RCA N ° 0005/2009. 2 hectares were added for improvements in the productive process (See the following figure). For further detail, a referential image of the area subject to environmental assessment is presented.
Subscribe to the most trusted business intelligence platform in Latin America. Let us show you our solutions for Suppliers, Contractors, Operators, Government, Legal, Financial and Insurance.
Related companies
Get valuable information on companies involved in the Modification of Residual Materials Reconversion Plant, RILESUR Ltda..
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Modification of Residual Materials Reconversion Plant, RILESUR Ltda..
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: Sales Manager
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Port infrastructure multipurpose in Puerto Williams
- Current stage:
- Updated:
4 years ago
- Project: Improvement and expansion service of apr chorombo, maria pinto
- Current stage:
- Updated:
3 months ago
- Project: Emergency work ssr la peña commune of nogales province of quillota
- Current stage:
- Updated:
11 months ago
- Project: CONSTRUCTION OF APR SERVICE OF DOLLINCO, COMMUNITY OF BIRTH
- Current stage:
- Updated:
1 year ago
- Project: Expansion and improvement apr manuel rodríguez hill commune
- Current stage:
- Updated:
11 months ago
- Project: (economic recovery plan) construction of the ilihue-los mañíos apr service, lago ranco commune, los Ríos region
- Current stage:
- Updated:
11 months ago
- Project: Survey construction of source and improvement ssr quintay comuna de casablanca
- Current stage:
- Updated:
11 months ago
- Project: Construction service apr punahue shipyards, district of dalcahue region of the lakes
- Current stage:
- Updated:
3 months ago
- Project: Replacement service apr pufudi, commune of mariquina, region of the rivers
- Current stage:
- Updated:
3 months ago
- Project: RURAL DRINKING WATER SYSTEM CONSTRUCTION KM23 ROUTE 240 AYSÉN-COYHAIQUE
- Current stage:
- Updated:
2 years ago
Other companies in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Wood Chile
-
Wood Chile is the local unit of Wood plc, a global provider of project, engineering and technical services for the energy and industrial sectors. It operates in Chile through se...
- Company: Ilustre Municipalidad de Andacollo
- Company: Ilustre Municipalidad de Calama
- Company: Ilustre Municipalidad de Caldera
- Company: Empresa de Montajes Industriales Salfa S.A.  (Salfa Montajes)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by BNamericas’ content team. However, it may have been au...
- Company: Besalco Construcciones S.A.  (Besalco Construcciones)
-
Besalco Construcciones, a subsidiary of Chilean construction company Belsaco, engages in engineering, architecture, infrastructure construction, including roads and tunnels, and...
- Company: Phoenix Contact Chile
- Company: BIOS Mining & Infrastructure  (BIOS MI)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
News in: Water & Waste (Chile)
Over 70% of water in Chile's copper mining industry expected to come from desal plants by 2033
Desalinated water use will increase due to persistent drought and as oxide resources deplete, according to state copper commission Cochilco.

Chile’s environmental submissions down 33% in 2022
The proposed investments total US$40.9bn compared to US$54.1bn the previous year.